Foundational Earned Value Management Techniques, Performance Index Techniques and Performance of Water and Sanitation Projects under Athi Water Works Development Agency, Kenya

Authors

  • Patricia Nyadhi Ochieng
  • Dr. Paul Munene

DOI:

https://doi.org/10.5281/zenodo.24341933

Abstract

Water and sanitation projects in Kenya continue to experience cost overruns, schedule delays and stakeholder dissatisfaction, despite substantial public and donor investment. Earned Value Management (EVM) integrates scope, schedule and cost into a single performance measurement system, yet its application in Kenyan water projects remains limited and insufficiently documented. This study examined the influence of two EVM techniques, foundational EVM techniques (Planned Value, Earned Value and Actual Cost) and EVM performance index techniques (Cost Performance Index and Schedule Performance Index), on the performance of water and sanitation projects under Athi Water Works Development Agency in Nairobi, Kiambu and Muranga counties. The study was anchored on project control theory. A descriptive cross-sectional survey design was adopted. Using Yamane’s formula and stratified random sampling, 120 professionals were selected from a population of 170 project managers, engineers, site supervisors, procurement officers and government officials. Data were collected using a structured questionnaire, and 102 usable responses were obtained, a response rate of 85%. Data were analysed using descriptive statistics, Pearson correlation and multiple linear regression. Respondents agreed that foundational EVM techniques (M = 3.68, SD = 0.70) and performance index techniques (M = 3.66, SD = 0.68) were applied in their projects. Both techniques had strong, positive and significant relationships with project performance (r = 0.684 and r = 0.678, p < 0.001). Together, the two techniques explained 69.2% of the variance in project performance, F(2, 99) = 111.05, p < 0.001. Foundational EVM techniques (Beta = 0.512, p < 0.001) and performance index techniques (Beta = 0.503, p < 0.001) each made a significant unique contribution. The study concludes that clearly defined baselines and routine use of cost and schedule performance indices are associated with better project performance. It recommends training of project staff in EVM, consistent recording of Planned Value, Earned Value and Actual Cost, and the use of CPI and SPI in all project progress reports.

Keywords: Earned Value Management, Cost Performance Index, Schedule Performance Index, Project Performance, Water and Sanitation Projects, Kenya

Author Biographies

  • Patricia Nyadhi Ochieng

    Postgraduate student, MSc Project Management, Jomo Kenyatta University of Agriculture and Technology

  • Dr. Paul Munene

    Lecturer, Jomo Kenyatta University of Agriculture and Technology

References

Anbari, F. T. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12–23.

Aramali, V., Gibson, G. E., Jr., El Asmar, M., & Sanboskani, H. (2024). An effective earned value management system (EVMS) is a team sport. Project Management Journal, 55(4), 389–405. https://doi.org/10.1177/87569728231226226

Ayalew, G. M., Meharie, M. G., & Ayalew, G. G. (2023). Regression modeling for prediction of earned value indexes in public building construction projects: The case of Ethiopia. Cogent Engineering, 10(1), Article 2220497. https://doi.org/10.1080/23311916.2023.2220497

Connelly, L. M. (2008). Pilot studies. MedSurg Nursing, 17(6), 411–412.

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications.

Field, A. (2018). Discovering statistics using IBM SPSS Statistics (5th ed.). SAGE Publications.

Fleming, Q. W., & Koppelman, J. M. (2010). Earned value project management (4th ed.). Project Management Institute.

Hussein, A. R., & Moradinia, S. F. (2024). Time and cost management in water resources projects utilizing the earned value method. Journal of Studies in Science and Engineering, 91–111. https://doi.org/10.53898/josse2024417

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Wiley.

Kim, E., Wells, W. G., Jr., & Duffey, M. R. (2003). A model for effective implementation of earned value management methodology. International Journal of Project Management, 21(5), 375–382. https://doi.org/10.1016/S0263-7863(02)00049-2

Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27(4), 400–407.

Ong’ondo, C. B., Gwaya, A. O., & Masu, S. (2019). Appraising the performance of construction projects during implementation in Kenya, 1963–2018: A literature review perspective. KICEM Journal of Construction Engineering and Project Management, 9(2). https://doi.org/10.6106/JCEPM.2019.9.2.001

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® guide) (7th ed.). Project Management Institute.

Reda, S. G., Belachew, K. T., Demiss, B. A., & Ali, S. K. (2025). Performance evaluation of construction project by earned value management system in Amhara waterworks construction enterprise. Discover Civil Engineering. https://doi.org/10.1007/s44290-025-00193-0

Taherdoost, H. (2016). Validity and reliability of the research instrument: How to test the validation of a questionnaire/survey in a research. International Journal of Academic Research in Management, 5(3), 28–36.

Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach’s alpha. International Journal of Medical Education, 2, 53–55. https://doi.org/10.5116/ijme.4dfb.8dfd

Vanhoucke, M. (2010). Measuring time: Improving project performance using earned value management. Springer.

Yalçın, G., Bayram, S., & Çıtakoğlu, H. (2024). Evaluation of earned value management-based cost estimation via machine learning. Buildings, 14(12), 3772. https://doi.org/10.3390/buildings14123772

Yamane, T. (1967). Statistics: An introductory analysis (2nd ed.). Harper & Row.

Downloads

Published

2026-11-18

Issue

Section

Articles

How to Cite

Nyadhi Ochieng, P., & Munene, P. (2026). Foundational Earned Value Management Techniques, Performance Index Techniques and Performance of Water and Sanitation Projects under Athi Water Works Development Agency, Kenya. International Research Journal of Project Management, 8(1), 90-99. https://doi.org/10.5281/zenodo.24341933